5G Base Station PCBA Assembly for Continuous Operation
Base station control boards are installed where access is difficult and uptime matters. Our SMT and DIP lines, X-Ray inspection and aging test are organised around producing assemblies that can be trusted in continuously running infrastructure.
Pain Points in Infrastructure Boards
Long service life changes the manufacturing priorities.
Continuous duty
Boards operate around the clock, so early-life failures must be screened out before installation.
Fine-pitch devices
BGA and QFN packages with 0.3mm BGA capability need X-Ray verification.
Mixed technologies
RF sections and power connectors often require both SMT and DIP on one assembly.
Outdoor exposure
Conformal coating is available where equipment faces moisture or dust.
Process Route
File review under NDA
Send BOM and Gerber files by email. We quote within 24–48 hours, and sign NDA on request for infrastructure programs.
SMT and DIP assembly
BGA down to 0.3mm, QFN, 0201 and 01005 components are placed with controlled profiles; DIP covers through-hole connectors and power parts.
X-Ray and inspection
AOI covers placements and X-Ray verifies BGA joints, keeping void rate below 15%.
Test, coat and pack
ICT and FCT validate the board; aging test and optional conformal coating prepare it for continuous field operation.

Industrial control board
Infrastructure assemblies in our factory are typically control boards on industrial platforms. We do not publish unconfirmed board specifications — send your design files and our engineers will confirm the assembly and test route.
See all mainboard platforms →Test Plan
Batch-level COC is issued through IQC, IPQC and OQC.
X-Ray
Hidden BGA joints inspected with void rate below 15%.
ICT + FCT
Electrical and functional checks on every assembled lot.
Aging test
Powered screening for boards intended to run without interruption.
Delivery & Documentation
Assembly is carried out in our 2,600㎡ Shenzhen facility under ISO9001:2015, with a factory yield of 99.7% or higher. Each shipment includes batch-level COC. For a protected 5G infrastructure program, contact yun@dhc-pcba.com — we respond within 24–48 hours.
Quote a base station control board
24–48h response · NDA on request · BOM/Gerber by email.